Kenyah riverine settlements in Ulu Baram will be connected with road access soon

One of the workers is seen excavating the area for the paved road project. Photo credit: Recoda
Advertisement

KUCHING, Aug 1: Kenyah riverine settlements of Long Selaan and Long Moh in Ulu Baram will be connected with road access soon through project implemented by the Highland Development Agency (HDA) under Regional Corridor Development Authority (Recoda).

Recoda, in a media statement posted in its website today, said the 8.2 kilometre paved road project will link the nearby villages, while the existing 16 kilometre of earth road connecting Long Selaan to the Tinjar-Bario logging road will be upgraded.

“The project will also see the construction of a 0.25km spur road to SK Long Moh, a 0.4km road improvement to Long Moh and the upgrade of 6.7km of existing road to R1 Standard,” it said.

Advertisement

The agency added that currently, works are being carried out on the concrete pier columns for the Bailey bridges that will cross Sungai Moh and Batang Baram near the two settlements.

“Slope cutting and other earthworks are also being carried out along the roads, which will be followed by paving and roadworks,” it said.

Map showing the proposed construction of new spur road to SK Long Moh, including improvement and construction of road in Long Selaan, Long Moh. Photo credit: HDA

Long Selaan, famed for its Tekiwit Waterfall, is located in the north along Batang Baram while Long Mong is located along Sungai Moh, at the confluence with the larger Baram River.

The Orang Ulu settlements are located about 20km from the Indonesian border, or about 200km southeast of Miri city. – DayakDaily.

Advertisement