KUCHING, April 2: A portion of Jalan Kuching-Serian will undergo a temporary partial closure from 10pm to 4am starting tomorrow (April 3) until May 10 to facilitate repair works on several bridges.
In an advisory notice today, the Public Works Department (JKR) Sarawak stated that repair works will be conducted on Sg Temong bridge, Sg Batu bridge and Sg Sinjok bridge.
Motorists are urged to exercise extra caution when approaching and navigating through the construction zones.
For more information on the traffic flow, the public can contact JKR Serian Division Office at 082-876670 during office hours. — DayakDaily
Advertisement