One lane at Sg Adong Bridge to be closed from April 14-23

An aerial view of Sg Adong Bridge. Photo: Ukas
Advertisement

MIRI, April 12: One road lane will be closed at Sg Adong Bridge (towards Pujut 7 from Miri By-pass) to give way for safety component installation work.

According to a report by Sarawak Public Communications Unit (Ukas), the Pan Borneo Highway Unit of Sarawak Public Works Department (PWD) in a media statement today said that the closure of the lane will be from April 14 to 23 this year.

Following this, the public is advised to be careful while passing through the road and adhere to the safety signs provided. —DayakDaily

Advertisement
Advertisement