
By Marlynda Meraw
KUCHING, Nov 29: Constituents in Asajaya remain optimistic about their area’s ongoing development following the unopposed victory of incumbent Dato Sri Abdul Karim Rahman Hamzah, though residents are hoping to see stronger internet connectivity and dedicated housing land allocations in the coming term.
A check with local traders at the Tambirat Market revealed widespread appreciation for the infrastructure already delivered under Abdul Karim’s leadership, alongside a wish list for future improvements.
Fishmonger Fuad, 60, noted that the construction of the Tambirat Market had provided local hawkers with a proper, designated space to sell their goods.
Looking ahead, he expressed anticipation for the proposed waterfront project at the market, which is slated to be developed alongside Samarahan Bridge 2, currently under construction.
“This (Tambirat) market is good. We have a proper place to sell the fish. Now, I hope to see the waterfront project to be realised,” shared Fuad to DayakDaily team.
Sharing similar sentiments, 55-year-old stall owner Ogayah Drahman said the market had greatly improved trading conditions by sheltering vendors from the sun and rain.
“Before the market was built, we had to set up stalls by the roadside. Vehicles stopping to buy things would cause traffic congestion,” Ogayah said.
With the new facility, Ogayah was glad that there are now ample parking spaces, dedicated wet and dry zones, and a food court that doubles as a convenient rest stop for weary travellers.
Beyond commercial facilities, Ogayah hoped the Sarawak government would consider allocating residential land lots for locals to build their own homes. Living close to the river, she explained that rising water levels during the rainy season posed a constant difficulty, and having a separate plot of land would serve as an important safeguard for her family.
While acknowledging that riverside residents occasionally faced water-related issues, she commended Abdul Karim and Kota Samarahan MP Datuk Rubiah Wang for consistently monitoring the situation and extending timely assistance to affected households.
Meanwhile, 39-year-old fishmonger Ariz gave a positive assessment of the constituency’s overall progress, but raised concerns over unstable internet connectivity in the area especially for students.
“When the connectivity drops, it can dampen their (students’) mood to study. Reliable internet access is important for education in today’s age,” said Ariz.
For Asajaya residents like Fuad, Ogayah, and Ariz, the improvements already seen at Tambirat Market where they make a living, and in their overall area reflect why they remain supportive of their representative and the current government, all while looking forward to more developments for the coming term.
Abdul Karim retained the Asajaya seat uncontested during the nomination day yesterday (Nov 28), extending his tenure as the constituency’s representative—a seat he has held since 2001. – DayakDaily




