JKR to open four-lane dual carriageway due to partial repair work at Beluru Interchange on Miri-Bintulu Road on April 23

The road map showed the opening of the four-lane dual-carriageway heading to Miri Road and road diversion to a single-carriageway heading to Bintulu.
Advertisement

By Dayak Daily Team

KUCHING, April 21: Sarawak Public Works Department (JKR) announced the opening of a four-lane dual carriageway road and Beluru Interchange on Miri-Bintulu Road (CH14+500-CH24+400) along the 10km stretch from 879KM to 889KM to carry out a partial road repair on April 23.

In an advisory notice today, JKR advised road users to be extra cautious during the repair period, especially at the road diversion along the construction area and from a single-carriageway to a dual-carriageway and vice versa.

Advertisement

JKR urged them to adhere to the safety standards provided by the signboards, at all times. — DayakDaily

Sarawak JKR Advisory Notice of the opening of four lanes of double carriageway Road and Beluru Interchange on Miri-Bintulu Road to do partial repair work.
The road map showed the opening of a four-lane dual-carriageway heading to Bintulu and the change to a single-carriageway heading to Miri.
Advertisement