Controlled water release from Bakun HEP reservoir from Oct 20-Nov 3

File photo: Water release from the 2,400MW Bakun Hydroelectric Plant during spillway gate checking in 2020.

KUCHING, Oct 18: Sarawak Energy Berhad (Sarawak Energy) will be conducting its seasonal controlled release of water from the reservoir of the 2,400MW Bakun Hydroelectric Plant (HEP) by releasing water at regulated volumes through the gated spillways from Oct 20 until Nov 3.

In a statement today, Sarawak Energy said the procedure is part of the hydropower operator’s standard management practice to regulate upstream water levels and to maintain the reservoir at a safe level.

This standard practice has been in place since Bakun was commissioned in 2010 and is common practice for hydropower operators worldwide.


Prior to the exercise, permission is secured from the Sarawak Rivers Board (SRB) and relevant communities are notified before the scheduled release.

“Since the commissioning of Bakun HEP, the severity of downstream flooding has been minimised as the dam holds back a large volume of rainwater.

“To further enhance management of reservoir levels, Sarawak Energy implemented a dynamic water dispatch management system in 2020 to integrate data on weather and inflow forecasts.

“This enables water release from Sarawak Energy’s plants to be modelled, incorporating predictive weather patterns and providing more accurate inflows and forecasted reservoir levels up to six months or more,” it said.

In addition to enabling Sarawak Energy to operate and run its hydroelectric plants more efficiently, the system provides for better planning and scheduling of controlled release, resulting in better water level management upstream and downstream for river navigation during the drier season and flood mitigation during rainier periods.

The system is currently adopted at Sarawak Energy’s three HEPs of Batang Ai, Murum and Bakun to manage the interplay between weather, water flows and water release requirements. — DayakDaily