
By Karen Bong
SRI AMAN, Nov 26: The Batang Lupar 2 Bridge has earned a place in the Malaysia Book of Records as having the tallest cable-stayed bridge tower in Malaysia, with its towering 145.5-metre structure standing at a height equivalent to a building of approximately 45 storeys.
The record-breaking achievement marks another milestone in Sarawak’s infrastructure development, showcasing the State’s growing engineering capabilities and commitment to delivering major infrastructure projects.
The bridge was officially opened by Sarawak Premier Datuk Patinggi Tan Sri Abang Johari Tun Openg at a ceremony in Sri Aman today.
Deputy Premier and caretaker Minister of Infrastructure and Port Development Datuk Amar Douglas Uggah Embas said the Batang Lupar 2 Bridge was the 14th mega bridge completed under the major bridge construction programme implemented by Public Works Department (JKR) Sarawak.
“The concrete tower was also designed and constructed with consideration for preserving the natural environment, particularly the Benak or tidal bore phenomenon, which has made Sri Aman town famous and a popular tourist destination,” he said when addressing the ceremony which was broadcast live via Ukas Channel.
Uggah expressed appreciation to the Premier for approving the project, saying it reflected his understanding of the importance of establishing closer connectivity between Simanggang and Betong.
“On behalf of the people of Sri Aman and Betong, I would like to express my deepest appreciation for the wisdom and outstanding leadership of the Honourable Premier in approving the construction of the Batang Lupar 2 Bridge,” he said.
He said the decision had brought significant and meaningful changes to families who frequently travelled between Betong and Sri Aman.
Uggah also highlighted the wider transformation taking place across Sarawak under the Premier’s leadership, noting that 22 mega bridges were currently being constructed throughout the State.
“Of these, 21 were being built by JKR Sarawak, while one mega bridge in Lawas was being constructed by the Regional Corridor Development Authority (RECODA), involving a combined investment of RM7 billion
“All the bridges were being financed using Sarawak’s own funds,” he emphasised.
With 14 mega bridges now completed, Uggah said the Gabungan Parti Sarawak (GPS) administration and the Premier had delivered on their promises to improve connectivity and infrastructure across the state.
“Promises have been kept. People no longer have to merely talk about bridges; they can now witness one bridge after another being completed,” he said.
Spanning the Batang Lupar River, the 870-metre cable-stayed bridge connects Sri Aman (Simanggang) with Lidong in the Betong Division, strengthening connectivity between the two areas and improving accessibility across central Sarawak.
According to JKR Sarawak, the bridge features a main span of 450 metres, while its 145.5-metre tower is complemented by a navigation clearance of 200 metres in width and 23 metres in height, allowing vessels to pass beneath it.
The RM223.63 million project forms part of Package B3 of the Sarawak Second Trunk Road Project, fully funded by the Sarawak government and implemented by the JKR Sarawak under the Ministry of Infrastructure and Port Development Sarawak.
In addition to the bridge structure, the project includes approximately 2,355 metres of approach roads and a two-lane carriageway constructed in accordance with JKR R5 standards.
Opened to the public on Oct 31, the bridge provides a more direct and efficient alternative route between Sri Aman and Betong, reducing the travelling distance from approximately 73km via the Pan Borneo Highway to between 28km and 30km through the Second Trunk Road.
The shorter route is expected to improve travel efficiency, reduce journey times and facilitate the movement of people and goods between the two divisions.
Beyond improving transportation links, the bridge is also expected to create new opportunities in trade, agriculture and tourism, while supporting economic activities and development along the Sri Aman–Betong corridor.
Its improved connectivity will also enhance access to services and economic opportunities for communities in surrounding areas, contributing to broader socioeconomic development in central Sarawak.
The completion of the project reflects the Sarawak government’s continued efforts to strengthen the state’s infrastructure network through investments in modern and sustainable connectivity, aimed at improving the quality of life and supporting long-term economic growth.
JKR Sarawak said it remained committed to delivering quality infrastructure projects that support the State’s development aspirations and provide lasting benefits to the people. — DayakDaily




